: TVOntario & TFO DTV Transition Status (closed)


Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 [14] 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

downbeat
2011-01-24, 11:51 AM
From http://www.crtc.gc.ca/eng/archive/2011/2011-38.htm#2.

The new post-transition digital rebroadcasting transmitter CICO-DT-18 would operate on channel 18 with an effective radiated power (ERP) of 2,400 watts (non-directional antenna with an effective height of antenna above average terrain (EHAAT) of 316 metres).
(...)The Commission also notes that this application is not in compliance with Notice No. SMBR-006-08 – Publication of the Digital Television (DTV) Post-Transition Allotment Plan of the Department of Industry (the Department) since the proposed technical parameters (ERP of 2,400 watts and EHAAT of 316 metres) exceed the Department’s allotted technical parameters (ERP of 1,200 watts and EHAAT of 313.80 metres).

PREDICTED COVERAGE

LEGEND:
• RED represents > 59.1 dBu
• YELLOW represents 39.1-59.1 dBu
• OTHER COLOURS represent potential interference

http://www.digitalhome.ca/forum/picture.php?albumid=505&pictureid=3505

Emerald_Boar
2011-02-02, 08:16 PM
This is by far the best contour maps that i have seen. YRH does some really great work.

CICA Toronto
http://fc05.deviantart.net/fs71/i/2011/033/a/5/cica_by_emeraldboar-d38nva8.png

CICO24 Ottawa
http://fc05.deviantart.net/fs71/i/2011/033/f/7/cico24_by_emeraldboar-d38nvvr.png

Read ya l8r,
Al

wilspin
2011-02-02, 08:20 PM
What about 18 at Rice lake?

tlamothe
2011-02-03, 12:01 PM
Wilspin, they are only transitioning stations which lie above 51 or are in a mandatory market.

You might have luck picking up the Belleville station.

HWP
2011-02-03, 12:38 PM
Emirald Boar,

Thank you for your post.

Can you post a link to those Ottawa and Toronto contour maps? I would like to be able to zoom in on them.

Emerald_Boar
2011-02-03, 07:07 PM
scrap gallery with everything I have posted
http://emeraldboar.deviantart.com/gallery/?catpath=scraps

CICA Torona <:
http://emeraldboar.deviantart.com/gallery/?catpath=scraps#/d38nva8

CICO Ottawa
http://emeraldboar.deviantart.com/gallery/?catpath=scraps#/d38nvvr

Read ya l8r,
Al

roger1818
2011-02-04, 10:49 AM
Can you post a link to those Ottawa and Toronto contour maps? I would like to be able to zoom in on them.

Those are just screen shots, so they have reduced resolution. The original PDFs are in the appropriate applications which can be found in Broadcasting Information Bulletin CRTC 2011-63 (http://www.crtc.gc.ca/eng/archive/2011/2011-63.htm)

argilo
2011-02-24, 02:27 PM
I was just looking through the list of submissions to the CRTC's call for comments on digital transition PSAs (https://services.crtc.gc.ca/pub/ListeInterventionList/Default-Defaut.aspx?en=2010-927&lang=e) and noticed in TVO's submission that they plan to begin converting their transmitters to digital as early as May:

In TVO’s case, the digital conversion will take place on a “staggered” basis, with some of TVO’s transmitter sites effecting the cutover as early as May of 2011, prior to the August 31, 2011 deadline imposed by the Commission.

Jase88
2011-02-24, 02:34 PM
May 2011 would definitely be nice. Hopefully one of these is either Kitchener or Toronto!

micah
2011-02-24, 02:35 PM
Or London :)

flavoie
2011-02-24, 02:39 PM
no, Ottawa ! :) We definitely could use another digital channel. Toronto has plenty ;)

Jase88
2011-02-24, 02:42 PM
I'm not holding my breath though. Everything about TVO shows them dragging their feet as long as they possibly can....

dh1s13
2011-02-27, 11:37 AM
Hi Everyone,
Please see TVO official status release regarding OTA in Mandatory markets...

JamesK
2011-02-27, 11:53 AM
I see digitalhome.ca is listed as a reference.

majortom
2011-02-27, 12:11 PM
as well as the fcc, go figure. also noted they didn't even reference their own website? So where did that document come from?
edit: \/\/\/\/ - see it now, thx

stampeder
2011-02-27, 12:13 PM
Look under: http://www.tvo.org scroll down to list of links at the bottom of the page click on "About" click on "Corporate Documents" in red banner bar scroll down to "TVO Strategic Agenda" as of today the PDF is second from the top as "TVO Digital Over-the-air Conversion Update, Winter 2011 (PDF) (2011/01/06)" Full html link here:http://www.tvo.org/about/CorporateDocs/TVODigitalOverTheAirConversionUpdateWinter2011.pdf

bentoronto
2011-02-27, 12:31 PM
Cute of them to suggest you get a converter with an analog pass-through!

The doc comes perilously close to saying nothing at all. An achievement.

Jase88
2011-02-27, 03:01 PM
dh1s13, I already posted that information in post #253 back in early January.

Jase88
2011-03-01, 01:38 PM
I was just looking through the list of submissions to the CRTC's call for comments on digital transition PSAs (https://services.crtc.gc.ca/pub/ListeInterventionList/Default-Defaut.aspx?en=2010-927&lang=e) and noticed in TVO's submission that they plan to begin converting their transmitters to digital as early as May:

From TVO's Facebook (http://www.facebook.com/tvontario) page, responding to the question of whether or not some transmitters will be converted to digital as early as May:

TVO wrote: "Untrue. All 9 sites will be converted in the middle of Aug. Plans underway now. We will be running PSAs on air and online soon detailing info for all sites."

El Gran Chico
2011-03-01, 04:06 PM
TVO's Lisa de Wilde said the following to the CRTC:TVO submits that the requirement to begin airing PSAs containing the above-noted
specific information no later than March 1, 2011 is unduly restrictive and moreover
does not reflect the actual manner in which the DTV transition will occur in many
markets. In TVO’s case, the digital conversion will take place on a “staggered”
basis, with some of TVO’s transmitter sites effecting the cutover as early as May of
2011, prior to the August 31, 2011 deadline imposed by the Commission. With
respect to these transmitter sites, the six month advance notice period prescribed by
subsection 3(1) of the Digital Regulations has already passed and, therefore, it
would not be possible to comply with the requirement upon its enactment.